The IREN Childress campus immediately strikes with its immense scale, operating as a small city built around power and cooling. Designed to support 40 EH/s of Bitcoin mining alongside the foundation for cloud-scale AI, the 750 MW site, already running at 500 MW, is intricately linked to 345 kV lines. Inside the air-cooled Bitcoin halls, efficiency is paramount, maintained through rigorous weekly cleaning, quarterly filter swaps, and a 27-technician onsite repair team—the critical, unglamorous work ensuring high uptime.
The transition to High-Performance Computing (HPC) involves closed-loop cooling and massive water infrastructure, justifying the substantial "$10–$12 million per megawatt" investment. The Microsoft agreement frames the future, with infrastructure—buildings, power, and cooling—engineered for a 20-year lifespan, providing necessary density headroom and reconfigurable layouts to adapt to evolving thermal loads.
This strategy transforms infrastructure into optionality. The ability to streamline construction has already cut build times from twelve to eight weeks, accelerating revenue. Strong community ties, local hiring, and a pervasive safety culture are evident. As the Horizon data halls prepare for the arrival of GPUs, security is tightening, marking the facility’s full pivot toward next-generation computing.
Watch Video